Shot Time Operator Iplasma(kA) n(1018m-3) Duration (ms) Pre/post shot comments
143942007-02-28 16:38:08.925pduarte43.131Cu-nD at position 33,5. P Feedback on Horizontal field and on Vertical Field. Horizontal position setpoint = 8 mm. SE30F measurement.
143932007-02-28 16:27:11.135pduarte4.23.731Cu-nD at position 33,5. P Feedback on Horizontal field and on Vertical Field. Horizontal position setpoint = 8 mm.
143922007-02-28 16:16:48.669pduarte4.23.531Cu-nD at position 33,5. P Feedback on Horizontal field and on Vertical Field. Horizontal position setpoint = 8 mm.
143912007-02-28 16:07:10.54pduarte3.8331Cu-nD at position 33,5. P Feedback on Horizontal field and on Vertical Field. Horizontal position setpoint = 8 mm.
143902007-02-28 15:57:28.739pduarte4.1331Cu-nD at position 33. P Feedback on Horizontal field and on Vertical Field. Horizontal position setpoint = 8 mm.
143892007-02-28 15:48:37.186pduarte4.3331Cu-nD at position 32. P Feedback on Horizontal field and on Vertical Field. Horizontal position setpoint = 8 mm.
143882007-02-28 15:42:13.71pduarte4.2330Cu-nD at position 31. P Feedback on Horizontal field and on Vertical Field. Horizontal position setpoint = 8 mm.
143872007-02-28 15:31:57.154pduarte4.5330P Feedback on Horizontal field and on Vertical Field. Horizontal position setpoint = 8 mm.
143862007-02-28 15:25:33.045pduarte4.32.930P Feedback on Horizontal field and on Vertical Field. Horizontal position setpoint = 10 mm.
143852007-02-28 15:07:39.885pduarte43.130P Feedback on Horizontal field and on Vertical Field.
143842007-02-28 14:59:51.323pduarte000wrong settings