|
Shot
|
Time
|
Operator
|
Iplasma(kA)
|
n(1018m-3)
|
Duration (ms)
|
Pre/post shot comments
|
| 39803 | 2016-05-04 16:03:05.163 | fernando | 4 | 3.75 | 225 | increase number of cycles from 8 to 10 / LP show an offset of -0.01 |
| 39802 | 2016-05-04 15:53:11.297 | fernando | 4 | 3.75 | 100 | calibrate HIBD vertical meas. from LP (v_offset = 0.004) / may not be a good idea to use LP for calibration, adding 2 more cycles to check |
| 39801 | 2016-05-04 15:31:51.103 | fernando | 4 | 3.75 | 125 | increase number of cycles from 4 to 8; vertical position feedback by HIBD / Iprim OK |
| 39800 | 2016-05-04 15:17:43.851 | fernando | 4 | 4.2 | 100 | same as previous to retest Iprim / not enough discharge time to check if Iprim was OK |
| 39799 | 2016-05-04 15:01:37.983 | fernando | 4 | 4 | 75 | HIBD on; current control for vertical position; test Iprim calculations on HevayIonBeamGAM.cpp / Iprim calcs NOT OK; HIBD signals from FPGA all OK |