Shot
|
Time
|
Operator
|
Iplasma(kA)
|
n(1018m-3)
|
Duration (ms)
|
Pre/post shot comments
|
| 51804 | 2025-02-27 19:15:10.696 | rhenriques | 0 | 0 | 0 | Repeat with inversion to Ip < 0 back to normal as in #51798 and adjusted vertical waveform for positive cycle to optimize inversion to Ip < 0 | MARTe failed |
| 51803 | 2025-02-27 18:53:27.229 | rhenriques | -0.39 | 0 | 0 | Repeat with waveform going in opposite direction than previous pulse | Not clear if it is better |
| 51802 | 2025-02-27 18:45:11.333 | rhenriques | 0 | 0 | 0 | Back to 7000 us of max inv. time and tweak on Inversion waveform for horizontal field for transition to Ip < 0 | Got worst |
| 51801 | 2025-02-27 18:28:40.974 | rhenriques | -0.46 | 0 | 0 | Repeat with max inversion time set to 2000 us | Similar results as previous |
| 51800 | 2025-02-27 18:21:14.228 | rhenriques | -0.48 | 0 | 0 | Repeat with correct maximum inversion time 1500 us | Inversions got worse |
| 51799 | 2025-02-27 17:57:08.884 | rhenriques | -0.36 | 0 | 2 | Repeat but with 8 cycles only and max inversion time down to 1500 us (instead of 7000 us) | maximum time was 15000 us, by mistake |
| 51798 | 2025-02-27 17:49:30.652 | rhenriques | -0.45 | 0 | 0 | Repeat | OK, but pulse was programmed with 40 cycles |
| 51797 | 2025-02-27 17:43:44.698 | rhenriques | 0 | 0 | 0 | Repeat previous, LP for positions in B3ch25(bottom), B3ch26(HFS), B3ch27(top) and B3ch28(LFS) | MARTe failed again, reason is unclear |
| 51796 | 2025-02-27 17:37:35.424 | rhenriques | 0 | 0 | 0 | Try plasma, repeat #51783, with position Langmuir Probes acquired in 2 MSps, B3 ch. 25 to 28 | MARTe did not run because of wrong PS communicator addresses |
| 51795 | 2025-02-27 16:54:32.698 | rhenriques | 0 | 0 | 0 | Repeat to check Toroidal Field PS and current | OK |
| 51794 | 2025-02-27 16:10:55.758 | rhenriques | 0 | 0 | 0 | Dry run with on-coil PF and TF currents. Gas puff not expected to happen althoug programmed (to be checked at a later stage) | OK, but TF PS for cleaning was also connected to TF coils (breaker ON) |
| 51793 | 2025-02-27 15:54:35.566 | rhenriques | 0 | 0 | 0 | Repeat with adjusted zero points for current measurements, Primary PS: 511->510, Vertical PS: 511->509 and Horizontal PS: 511->510 | Good |
| 51792 | 2025-02-27 14:57:15.458 | rhenriques | 0 | 0 | 0 | Test dry run pulse as an informatic pulse only (no PF currents on the coils) | OK, gas puff does not seem to be working |