| 51970 | 2025-03-17 18:22:43.394 | rhenriques | 0 | 0 | 0 | Repeat with 0 V (shorted) | OK |
| 51969 | 2025-03-17 18:18:04.849 | rhenriques | 0 | 0 | 0 | Repeat with +4.096 V | OK |
| 51968 | 2025-03-17 18:12:00.692 | rhenriques | 0 | 0 | 0 | Calibration of B3 all chs. (1-32) with -4.096 V | OK |
| 51967 | 2025-03-17 18:01:48.766 | rhenriques | 0 | 0 | 0 | Repeat to test amp no. 4 and 7 with different acquistion cable | OK |
| 51966 | 2025-03-17 17:57:17.907 | rhenriques | 0 | 0 | 0 | Repeat testing HIBD amps no. 5 and 6 | OK |
| 51965 | 2025-03-17 17:51:24.439 | rhenriques | 0 | 0 | 0 | Repeat with swapped channels 3 and 4 as 4 was did not work in previous pulse | OK, no. 4 did not work, may be the cable |
| 51964 | 2025-03-17 17:46:18.888 | rhenriques | 0 | 0 | 0 | Repeat, now with amplifiers 3 and 4 | OK |
| 51963 | 2025-03-17 17:40:43.906 | rhenriques | 0 | 0 | 0 | Repeat | OK |
| 51962 | 2025-03-17 17:31:49.518 | rhenriques | 0 | 0 | 0 | Repeat | OK |
| 51961 | 2025-03-17 17:27:28.474 | rhenriques | 0 | 0 | 0 | Repeat just for HIBD acquisition tests | OK |
| 51960 | 2025-03-17 17:06:19.834 | rhenriques | 0 | 0 | 0 | Test all RT1 channels with 13 Vpp sine wave, HIBD acquisition tests continues | OK, but signals generated a HARD stop in MARTe |
| 51959 | 2025-03-17 16:57:42.422 | rhenriques | 0 | 0 | 0 | Calibration of RT2 chs. 17-28 with 0 V (shorted), HIBD tests on B3 ch. 9-16 and 25-32 | OK |
| 51958 | 2025-03-17 16:42:09.673 | rhenriques | 0 | 0 | 0 | Calibration of RT2 chs. 17-28 with -4.096 V, HIBD tests on B3 ch. 9-16 and 25-32 | OK |
| 51957 | 2025-03-17 16:24:59.993 | rhenriques | 0 | 0 | 0 | Calibration of RT2 chs. 17-28 with +4.096 V, HIBD tests on B3 ch. 17-32 | OK |
| 51956 | 2025-03-17 15:51:08.263 | rhenriques | 0 | 0 | 0 | Calibration of RT2 chs. 17-24 with -4.096 V, RT2 chs. 9 and 16 shorted (0 V), HIBD tests on B3 ch. 17-32 | OK |
| 51955 | 2025-03-17 15:12:25.689 | rhenriques | 0 | 0 | 0 | Repeat with repaired ADC module no. 28 and inspected module 12 (which was working in pulse 51945), RT2 ch. calibration no. 9 and 16 with -4.096 V | OK |
| 51954 | 2025-03-17 14:13:40.659 | rhenriques | 0 | 0 | 0 | Repeat with changed ADC module on ch. 28 | OK, MARTe acquired this time |
| 51953 | 2025-03-17 11:21:51.019 | rhenriques | 0 | 0 | 0 | Informatic pulse to test B3 (2MSps) after swapping chs. 22<->23 and 27<->28 and calibrate RT2 channels: 9 and 16 with 4.096 V | MARTe acquistion failed (operator fault) |