|
Shot
|
Time
|
Operator
|
Iplasma(kA)
|
n(1018m-3)
|
Duration (ms)
|
Pre/post shot comments
|
| 52907 | 2025-05-29 18:06:49.627 | rhenriques | -4.5 | 5 | 18 | Repeat with adjustment on vertical field for Ip<0 | change in position not clear, mostly the same as in previous |
| 52906 | 2025-05-29 18:01:05.927 | rhenriques | -4.5 | 5 | 18 | Repeat with 40 semi-cycles | Ip decreases towards the end, transistions not optimized |
| 52905 | 2025-05-29 17:55:58.692 | rhenriques | -4.6 | 4.1 | 18 | Repeat with 20 semi-cycles | OK, but transitions towards the end are not optimized |
| 52904 | 2025-05-29 17:50:37.856 | rhenriques | -4.6 | 5.3 | 18 | Plasma pulse for conditioning at maximum available plasma current (but not much higher than 4 kA), repeat 52761 (14 semi-cycles) | Impurity level seems to be lower than the reference already |
| 52903 | 2025-05-29 17:43:12.854 | rhenriques | 1.3 | 2.7 | 26 | Repeat once more | Many failed pulses again, plasma may no long be resistive enough for this type of pulse |
| 52902 | 2025-05-29 17:39:15.777 | rhenriques | 1.3 | 2.6 | 26 | Plasma pulse for conditioning at low Ip, repeat 52835 | Many failed semi-cycles |
| 52901 | 2025-05-29 17:34:32.414 | rhenriques | -4.7 | 4.9 | 26 | Repeat (3) 52837 to assess max Ip and wall conditioning | OK |
| 52900 | 2025-05-29 17:30:35.281 | rhenriques | -4.7 | 4.9 | 26 | Repeat (2) 52837 to assess max Ip and wall conditioning | Closer to 52858 but one cycle failed |
| 52899 | 2025-05-29 17:26:02.98 | rhenriques | 4 | 4.2 | 26 | Repeat (1) 52837 to assess max Ip and wall conditioning | OK |
| 52898 | 2025-05-29 17:16:32.844 | rhenriques | 0 | 0 | 0 | Repeat with capacitor bank at nominal voltage (240 V) and including IVert and IHorz | PF currents OK |
| 52897 | 2025-05-29 17:11:11.337 | rhenriques | 0 | 0 | 0 | Repeat dryrun (52880) with lower bank voltage (100 V) to check everything is OK after the tests, Iprim only | Good |
| 52896 | 2025-05-29 16:51:55.673 | rhenriques | 0 | 0 | 0 | Primary coils with configuration for Horizontal field, 200 A | Good |
| 52895 | 2025-05-29 16:43:53.032 | rhenriques | 0 | 0 | 0 | Primary coils with configuration for Horizontal field, 200 A | Not enough bank voltage as current is not sustained |
| 52894 | 2025-05-29 16:39:50.139 | rhenriques | 0 | 0 | 0 | Primary coils with configuration for Horizontal field, 150 A | Good |
| 52893 | 2025-05-29 16:35:41.918 | rhenriques | 0 | 0 | 0 | Primary coils with configuration for Horizontal field, 100 A | Good, IGBT fully open by the end, need more voltage for higher current |
| 52892 | 2025-05-29 16:31:33.01 | rhenriques | 0 | 0 | 0 | Repeat with 500 ms long | Good |
| 52891 | 2025-05-29 16:27:12.117 | rhenriques | 0 | 0 | 0 | Primary coils with configuration for Horizontal field (lower coil with nominal direction and upper coil with opposite direction, decoupled from Iron core), 50 A, 100 ms | OK |
| 52890 | 2025-05-29 16:04:31.833 | rhenriques | 0 | 0 | 0 | Upper primary coil only, 200 A | Good |
| 52889 | 2025-05-29 16:00:33.556 | rhenriques | 0 | 0 | 0 | Upper primary coil only, 150 A | Good |
| 52888 | 2025-05-29 15:56:33.591 | rhenriques | 0 | 0 | 0 | Upper primary coil only, 100 A | Good |
| 52887 | 2025-05-29 15:48:49.382 | rhenriques | 0 | 0 | 0 | Upper primary coil only, 50 A | Good |
| 52886 | 2025-05-29 15:34:23.538 | rhenriques | 0 | 0 | 0 | Repeat with 200 A | Good |
| 52885 | 2025-05-29 15:29:19.527 | rhenriques | 0 | 0 | 0 | Repeat with 50 A | Good |
| 52884 | 2025-05-29 15:25:21.49 | rhenriques | 0 | 0 | 0 | Repeat with 100 A (instead of 150 A) | Good |
| 52883 | 2025-05-29 15:20:28.862 | rhenriques | 0 | 0 | 0 | Repeat with 500 ms long | Good |
| 52882 | 2025-05-29 15:14:31.539 | rhenriques | 0 | 0 | 0 | Repeat with the lower primary coil only (single coil of 14 turns) | Good |
| 52881 | 2025-05-29 14:54:37.388 | rhenriques | 0 | 0 | 0 | Special dryrun with Iprim only for calibration of Magnetic pickup coils, short waveform for initial testing (100 ms only), repeat 52370, bank: 80 V | Iprim did not reach request (IC not saturated yet) |
| 52880 | 2025-05-29 14:32:02.479 | rhenriques | 0 | 0 | 0 | Repeat with lower capacitor bank voltage (from 260 to 80 V approximatley) | OK |
| 52879 | 2025-05-29 14:27:06.364 | rhenriques | 0 | 0 | 0 | Dryrun (file: dryrun_standard_2025_04_04_52149.cfg) no TF, no Vertical and no Horizontal, Primary filed current only. Returning to previous ISTTOK MARTe version (without MLControlGAM) | OK |
| 52878 | 2025-05-29 11:09:40.50 | rhenriques | 0 | 0 | 0 | Repeat with 250 hidden layers | MARTe constantly losing 2 packets (real-time of 100 us is now too short) MLControlGAM execution time is 58.6 us, ATCAAdcGAM with 96.9 us |
| 52877 | 2025-05-29 11:04:46.256 | rhenriques | 0 | 0 | 0 | Repeat with 225 hidden layers | MLControlGAM execution time is 46.5 us, ATCAAdcGAM exec. time not clear to interpret as it oscillates a lot |
| 52876 | 2025-05-29 11:00:48.859 | rhenriques | 0 | 0 | 0 | Repeat with 200 hidden layers | MLControlGAM execution time is 36.5 us, ATCAAdcGAM with 19.8 us |
| 52875 | 2025-05-29 10:56:51.326 | rhenriques | 0 | 0 | 0 | Repeat with 175 hidden layers | MLControlGAM execution time is 29.1 us, ATCAAdcGAM with 27.9 us |
| 52874 | 2025-05-29 10:52:45.218 | rhenriques | 0 | 0 | 0 | Repeat with 150 hidden layers | MLControlGAM execution time is 22.7 us, ATCAAdcGAM with 35.5 us |
| 52873 | 2025-05-29 10:48:45.325 | rhenriques | 0 | 0 | 0 | Repeat with 125 hidden layers | MLControlGAM execution time is 15.3 us, ATCAAdcGAM with 43.6 us |
| 52872 | 2025-05-29 10:44:21.713 | rhenriques | 0 | 0 | 0 | Repeat with correct MARTe real-time cylce (back to 100 us), assess minimum time required for ATCAAdcGAM to run | OK, ATCAAdcGAM still with about 50us available |
| 52871 | 2025-05-29 10:38:43.247 | rhenriques | 0 | 0 | 0 | Test MLControlGAM with size of 100 hidden layers | OK, but real-time cycle of MARTe was still set to 150 us, GAM execution time 10.5 us |