Shot
|
Time
|
Operator
|
Iplasma(kA)
|
n(1018m-3)
|
Duration (ms)
|
Pre/post shot comments
|
| 53075 | 2025-06-16 17:02:03.347 | rhenriques | 4 | 0 | 25 | Repeat | Density signal not working again, while SINE and COSINE look OK |
| 53074 | 2025-06-16 16:34:35.322 | rhenriques | 4 | 5.7 | 25 | Repeat for signal checks | All OK |
| 53073 | 2025-06-16 16:16:05.17 | rhenriques | 4 | 5.4 | 25 | Repeat after checking the connections | COSINE signal is back and density signal also. The issue could have been the same for both in the end. |
| 53072 | 2025-06-16 15:53:07.297 | rhenriques | 4 | 0 | 25 | Repeat with cable to data acquisition connected | SINE is OK, but COSINE stopped working, density signal also not working (but not related with intervention) |
| 53071 | 2025-06-16 15:44:02.628 | rhenriques | 4 | 0 | 25 | Repeat after cabling repair | SINE signal back to its original channel: RT1ch26 | Forgot to connect one of the cables back, ch was floating |
| 53070 | 2025-06-16 13:52:56.57 | rhenriques | 4 | 5.4 | 25 | Repeat | SINE amplifier and cable are working, must be the internal cable of the data acquisition as the channel was working for the calibration |
| 53069 | 2025-06-16 13:48:58.453 | rhenriques | 0 | 0 | 0 | Repeat to check SINE data acquisition cable (sawapping it with the IPLA one in RT2ch4) | Pulse aborted, no plasma |
| 53068 | 2025-06-16 11:57:26.12 | rhenriques | 4 | 5.3 | 25 | Repeat with further changes | Still the sames, no improvements |
| 53067 | 2025-06-16 11:51:35.468 | rhenriques | 4 | 5.2 | 25 | Repeat with Bv changes during transitions | No obvious changes |
| 53066 | 2025-06-16 11:44:45.698 | rhenriques | 4 | 5.5 | 25 | Repeat with 6 semi-cycles and Bv tweak removed | no changes for transitions, 2 neg cycles |
| 53065 | 2025-06-16 11:35:08.442 | rhenriques | 4 | 5.4 | 25 | Repeat with tweaks on Bv for Ip>0 | No clear changes for the transition |
| 53064 | 2025-06-16 11:26:56.977 | rhenriques | 4 | 5.5 | 25 | Repeat with prefill gas opening earlier | Ip flattop in indeed longer and not signs of primary current saturation |
| 53063 | 2025-06-16 11:22:46.637 | rhenriques | 4 | 4.6 | 25 | Repeat going back to Bv for transition as in 53061 and extending duration of cycle to 25 ms (instead of 22 ms) | BD happens too late, maybe due to late operening of gas, despite pressure in chamber OK |
| 53062 | 2025-06-16 11:15:54.131 | rhenriques | 4 | 5.7 | 22 | Repeat with changes in opposite direction | Worse than previous |
| 53061 | 2025-06-16 10:59:53.201 | rhenriques | 4 | 5.7 | 22 | Starting to tweak fields to improve transitions, first changing Bv of transition to Ip<0 | No improvements |
| 53060 | 2025-06-16 10:50:56.394 | rhenriques | 4 | 5.7 | 22 | Repeat 53053 to continue with development of stable BD followed by long AC discharge | BD relatively similar to refrence |
| 53059 | 2025-06-16 10:40:57.441 | rhenriques | -5.9 | 6.2 | 26 | Repeat (3) 53055 to assess max Ip and wall conditioning | Very similar to previous |
| 53058 | 2025-06-16 10:35:22.358 | rhenriques | -5.9 | 6.1 | 26 | Repeat (2) 53058 to assess max Ip and wall conditioning | Better than previous but still below reference |
| 53057 | 2025-06-16 10:09:19.137 | rhenriques | -5.6 | 5.5 | 26 | Repeat (1) 53055 to assess max Ip and wall conditioning | OK, Ip is lower than in reference |
| 53056 | 2025-06-16 09:59:21.68 | rhenriques | 0 | 0 | 0 | Dryrun (file: dryrun_standard_2025_04_04_52149.cfg), no TF | PF currents OK |