Shot
|
Time
|
Operator
|
Iplasma(kA)
|
n(1018m-3)
|
Duration (ms)
|
Pre/post shot comments
|
| 53378 | 2025-12-18 20:27:53.938 | fernando | 0 | 0 | 0 | Repeat 53369 (+275 A) because IPLB raw was not correctly connected | OK |
| 53377 | 2025-12-18 20:25:31.364 | fernando | 0 | 0 | 0 | Repeat previous (-275 A) with longer ramp down | OK |
| 53376 | 2025-12-18 20:19:52.147 | fernando | 0 | 0 | 0 | Repeat 53368 (-275 A) because IPLB raw was not correctly connected | OK |
| 53375 | 2025-12-18 19:57:21.096 | fernando | 0 | 0 | 0 | Repeat with -125 A | |
| 53374 | 2025-12-18 19:53:32.62 | fernando | 0 | 0 | 0 | Repeat (+125 A) with Rogowsky coils out from chopper modules and Mirnov coils 5 and 6 connected back | OK |
| 53373 | 2025-12-18 19:48:10.401 | fernando | 0 | 0 | 0 | Repeat 53370 (+125 A) because IPLB raw was not correctly connected | OK |
| 53372 | 2025-12-18 19:42:48.998 | fernando | 0 | 0 | 0 | Repeat because IPLB raw was not correctly connected | OK |
| 53371 | 2025-12-18 19:34:15.703 | fernando | 0 | 0 | 0 | Repeat aiming -125 A | OK |
| 53370 | 2025-12-18 19:31:41.793 | fernando | 0 | 0 | 0 | Repeat aiming to 125 A | OK |
| 53369 | 2025-12-18 19:26:13.071 | fernando | 0 | 0 | 0 | Repeat with +275 A | OK |
| 53368 | 2025-12-18 19:23:33.693 | fernando | 0 | 0 | 0 | Repeat with IPLB raw in RT3ch29 (instead of mirnov no.5) and IPLA in RT3ch30 (instead of mirnov no.6) | OK |
| 53367 | 2025-12-18 19:17:41.967 | rhenriques | 0 | 0 | 0 | Repeat with -275 A | OK |
| 53366 | 2025-12-18 19:09:17.903 | fernando | 0 | 0 | 0 | Repeat with higher current: 275 A | OK |
| 53365 | 2025-12-18 19:01:57.087 | fernando | 0 | 0 | 0 | Repeat with +200 A | OK |
| 53364 | 2025-12-18 18:58:40.314 | fernando | 0 | 0 | 0 | Repeat with Rogowsky coils out from chopper modules and Mirnov coils 5 and 6 connected back | OK |
| 53363 | 2025-12-18 18:55:28.721 | fernando | 0 | 0 | 0 | Repeat with -200 A | OK |
| 53362 | 2025-12-18 18:50:22.602 | fernando | 0 | 0 | 0 | Repeat with longer 400 ms pulse | OK |
| 53361 | 2025-12-18 18:40:54.796 | fernando | 0 | 0 | 0 | Repeat with IPLB raw in RT3ch29 (instead of mirnov no.5) and IPLA in RT3ch30 (instead of mirnov no.6) | OK |
| 53360 | 2025-12-18 18:24:37.156 | fernando | 0 | 0 | 0 | Repeat with IPLA integrated signal in RT2ch23 | There is signal, and a large offset |
| 53359 | 2025-12-18 18:16:44.971 | fernando | 0 | 0 | 0 | Repeat to be sure of the previous results | OK, results same as previous |
| 53358 | 2025-12-18 17:58:32.013 | fernando | 0 | 0 | 0 | Repeat pulse with IPLA and IPLB channels for integrated signals swapped at the acquisition | RT2ch4 still with quite large offset, IPLA signal looks reasonable at PlasmaCurrent channel |
| 53357 | 2025-12-18 17:51:26.852 | rhenriques | 0 | 0 | 0 | IPLB and IPLA back to their initial/standard integrator. Cable of IPLA integrator output was disconnected for last pulse. Run pulse with cable connected. | Signal with very large offset... |
| 53356 | 2025-12-18 17:45:03.65 | rhenriques | 0 | 0 | 0 | Repeat with IPLB and IPLA swapped at the input of the amplifier to check if IPLA provides some signal | There is signal on IPLA! IPLA integrator, cabling or acquisition channel needs checking |
| 53355 | 2025-12-18 17:38:19.617 | fernando | 0 | 0 | 0 | Repeat with half the resistance to get higher current | Got almost 200 A (without switching) |
| 53354 | 2025-12-18 17:22:47.577 | fernando | 0 | 0 | 0 | Repeat with 200 A (correctly configured) | Got saturation of current (no switching) |
| 53353 | 2025-12-18 17:18:04.601 | fernando | 0 | 0 | 0 | Repeat with correct configuration at 100 A | OK |
| 53351 | 2025-12-18 17:01:44.445 | fernando | 0 | 0 | 0 | Repeat with 200 A | still same result as previous ones as they were all programmed with 50 A... |
| 53350 | 2025-12-18 16:39:05.116 | fernando | 0 | 0 | 0 | Repeat with higher current: 100 A instead of 50 A | A lot of switching as cable response is much faster than the vertical coils |
| 53349 | 2025-12-18 15:57:05.993 | fernando | 0 | 0 | 0 | Previous pulse communication with Horizontal PS failed. Repeat with sniffer cable removed. IPLB int. in usual ch., IPLA int. RT2ch4, IPLB raw in RT3ch13 and IPLA raw in RT3ch14 | some chs. not working |
| 53348 | 2025-12-18 15:45:35.83 | fernando | 0 | 0 | 0 | In-vessel calibration with a cable entering the torus in section no.1 and exiting in no. 5, passing through the diagnostics. Using vertical PF circuit to feed current: 1st test with 50 A. MARTe failed |