|
|
| Session aim | Test breakdown changes, perform baking and maybe a series of shot for conditioning assessement | | Session day | 2025-02-03 | Operator | fernando | | Session ID | ISTTOK_202523_1 | Coordinator | rhenriques |
|
Shot
|
Time
|
Operator
|
Iplasma(kA)
|
n(1018m-3)
|
Duration (ms)
|
Pre/post shot comments
|
| 51714 | 2025-02-03 15:42:18.382 | rhenriques | -0.52 | 2.45 | 0.1 | Repeat with further change in BD (premag at -10 A) | BD still not successful, pressure at MC 7.97e-5 mBar | | 51713 | 2025-02-03 15:30:03.153 | rhenriques | -0.594 | 2.7 | 0.1 | Repeat with tweaks on Primary waveform for breakdown (pregam to -30) | Breakdown still not successful, pressure 8.5e-5 mBar at MC | | 51712 | 2025-02-03 15:23:39.271 | rhenriques | -0.6 | 2.3 | 0.1 | Repeat aiming to get same prefill pressure as previous for comparison | May not be exactly the same as adjustments where made prior the pulse | pressure at MC was 8.64e-5 mBar | | 51711 | 2025-02-03 15:19:38.706 | rhenriques | -0.67 | 2.65 | 0.1 | Repeat with better pressure control aiming at 7e-5 mBar | Better: 7.8e-5 mBar at MC | | 51710 | 2025-02-03 15:15:22.697 | rhenriques | -0.6 | 2.36 | 0.1 | Repeat #51697 aiming to a prefill of 7e-5 mBar | Pressure not well controlled (8.3e-5 mBar @ MC), but pulse OK |
|